[image]
« tripping in the hole Fatality »

Welcome Guest. Please Login or Register.
Jan 1, 2010, 1:02am



To post or reply to a question you must first log in



:: General :: Safety Alerts :: tripping in the hole Fatality
   [Search This Thread][Send Topic To Friend] [Print]
 AuthorTopic: tripping in the hole Fatality (Read 199 times)
Leonard
Administrator
*****
member is online



To-days readers are tomorrow leaders:

[yim]
[homepage]

Joined: Mar 2003
Gender: Male
Posts: 2,623
Location: England/Singapore
 tripping in the hole Fatality
« Thread Started on Aug 22, 2009, 5:02pm »

tripping in the hole Fatality

IMMEDIATE ALERT

DATE: March 27, 2009

TASK: Tripping In Hole

INJURY: Fatality

INCIDENT DESCRIPTION:

During the night shift the crew was tripping to bottom with the drill string. At approximately 745 meters into the hole, the drill string hit a bridge and became hung up. As a result in the sudden stop of the drill string the drawworks drum spooled off excess drill line until the drum brakes were applied. It was determined that the drill line would have to be spooled back onto the drum. It is believed that the worker proceeded to the area between the derrick and the drawworks. The drill string became free as it fell through the bridge. The drill line whipped up and towards the drawworks. It is believed that the drilling line struck worker as the slack in the drill line tightened. As a result the worker sustained fatal injuries from the impact.

Interim Corrective Actions Required:

All Rig Managers and Supervisors must review their site specific procedures and hazard assessments pertaining to encountering obstructions (bridges) in the wellbore.

If an obstruction is encountered while running in the wellbore which stops the drill string and results in slack drilling line, apply the drawworks brakes and set the slips immediately. This will prevent uncontrolled movement of overhead equipment and uncontrolled movement of the drill string.

All personnel must clear the floor immediately and stand in a safe area until an assessment of the potential risks are conducted and appropriate steps are confirmed.

In the event that an obstruction has been encountered, and the drilling line has spooled off the drum no personnel are permitted near the danger zone (within 1 meter of well centre and near drawworks) until the drill string has been secured from movement. The securement must be confirmed by the
Rig Manager before proceeding with operations.
Link to Post - Back to Top  IP: Logged

[image]

Resume at
urukpeoghene
Member
*
member is offline





Joined: Nov 2009
Gender: Male
Posts: 5
 Kicks While Drilling/Tripping
« Reply #1 on Nov 14, 2009, 5:42pm »

Please, can you throw more light on the following:

Kicks While Drilling/Tripping
« Last Edit: Nov 15, 2009, 3:17am by Leonard »Link to Post - Back to Top  IP: Logged
   [Search This Thread][Send Topic To Friend] [Print]



Advertise your company here
Your company Logo

























Google
Webdrillingclub.proboards.com
Click Here To Make This Board Ad-Free